Projects
This is a snapshot of projects that we’ve tackled. To date, we’ve removed over 320,000 pounds of material from our public spaces, natural areas, and surrounding properties.
“4PA has done so much for our town in a very short amount of time. Many thanks from all of us.”
Video by Jesse Major Photography
Peabody Creek before
Peabody Creek after
Overgrown downtown parking lot
Opened up downtown parking lot
Peabody Creek before
Peabody Creek after
Peabody Creek before
Peabody Creek after
Peabody Creek before
Peabody Creek after
Private business site before
Private business site after
Upper Peabody Creek valley before
Upper Peabody Creek valley after
Olympic Discovery Trail before
Olympic Discovery Trail after
Tumwater Creek valley before
Tumwater Creek valley after
Returning shopping carts
Quad hauling for the win!
Pack it up and haul it out!
Some jobs require some specialty gear
Hillside above Peabody Creek
Post cleanup signs
Gotta have some laughs along the way!
4PA truck with a load to dump
Cherry Hill before
Cherry Hill after
Upper Peabody Creek before
Upper Peabody Creek after
Downtown building before
Downtown building after
Land near fairgrounds before
Land near fairgrounds after
8th Street bridge before
8th Street bridge after
Upper Peabody Creek before
Upper Peabody Creek after
Upper Peabody Creek before
Upper Peabody Creek after
Tumwater Creek before
Tumwater Creek after
Tumwater Creek before
Tumwater Creek after
Peabody Creek boardwalk before
Peabody Creek boardwalk after (in partnership with Port Angeles Lions Club and Rural Development Initiatives)
Tumwater Creek before
Tumwater Creek after

